We had the opportunity to work for St. John Vianney Church- Activity Center Building. The project involved completely removing the existing old cedar exterior siding boards and replacing them with Hardie plank siding this includes; new exterior wall insulation, replacing any damaged wood framing studs, and installing new 1/2″ CDX plywood sheathing & wall synthetic barrier protection at the entire exterior building. We also installed new exterior LED lighting fixtures.

Our team worked meticulously to ensure that the installations were secure and would withstand any weather conditions. We take pride in transforming the exterior face of this project using top-of-the-line materials that were not only functional but also added a touch of elegance to the Activity Center Building facility.